Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare work
  2. System and/or network requirements for operating, monitoring and controlling H.V. apparatus through SCADA are identified from appropriate personnel and documentation, in accordance with workplace procedures
  3. System and/or network and associated H.V. apparatus and SCADA equipment operational prerequisites are identified and established, in accordance with workplace and manufacturers' procedures
  4. Sequence for recommissioning of system and/or network H.V. apparatus and equipment through SCADA is identified and determined, in accordance with workplace procedures
  5. Operate system/network equipment
  6. Load shedding requirements are identified, selected and monitored, in accordance with workplace procedures, during equipment operations to ensure system integrity
  7. System and/or network operations are completed in consultation with appropriate personnel
  8. Monitor system/network equipment
  9. System and/or network equipment is monitored for normal operations or to detect deviations, in accordance with workplace procedures
  10. Corrective actions to rectify system and/or network abnormalities are taken, in accordance with workplace procedures
  11. Appropriate personnel are notified when system and/or network equipment defects or abnormal operating conditions are detected, in accordance with workplace procedures
  12. Analyse system/networkequipment faults
  13. Operation of protection system is identified and assessed, in accordance with workplace procedures, to evaluate nature and cause of fault conditions
  14. Communication is established with key stakeholders, in accordance with workplace procedures, to identify nature and source of equipment system fault or failure
  15. Corrective action is taken, in accordance with workplace procedures
  16. Network and/or system integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel technical and operational documentation including contingency plans
  17. Complete documentation
  18. Documentation is updated, in accordance with workplace procedures