Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Monitor system/plant
  2. Plan for plant operation
  3. Work, combined cycle plant and resource requirements are identified from relevant information and documentation, in accordance with workplace procedures
  4. Preoperational checks are carried out on combined cycle plant, in accordance with workplace procedures and site requirements
  5. Operate heat recovery steam generator
  6. Supplementary firing system is placed into and out of service, as required, in accordance with workplace procedures, to maintain steam flow and steam conditions
  7. Combined cycle plant is operated within limits of its design, in accordance with workplace procedures and site requirements
  8. Combined cycle plant is operated, monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions
  9. Corrective action is taken to rectify abnormalities in combined cycle plant, in accordance with manufacturers' specifications and workplace procedures
  10. Operate generator and excitation system
  11. Synchronising requirements are assessed, evaluated and implemented, in accordance with workplace procedures, to ensure generator and excitation system stability
  12. Generator and excitation system is monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  13. Corrective actions are taken to rectify generator and excitation system abnormalities, in accordance with workplace procedures and manufacturers' recommendations
  14. Control generation of electrical energy
  15. Reactive power generation and voltage regulation requirements are assessed, in accordance with workplace procedures, to ensure the generator and excitation system is controlled to achieve desired output
  16. Generator stabilities and operating limits are assessed and the generator and excitation system is controlled to maintain those limits, in accordance with workplace procedures and manufacturers' recommendations
  17. Generator cooling systems and limits are monitored and assessed, and excitation system is controlled to maintain those limits, in accordance with workplace procedures and manufacturers' recommendation
  18. Coordinate generator and excitation systemoperations
  19. Generator and excitation systems are monitored and observed, in accordance with workplace procedures, to detect deviations from normal operating conditions
  20. Causes of abnormal generator and excitation system operating conditions are identified by analysing technical and operational data and information, in accordance with workplace procedures
  21. Corrective action is taken to rectify generator and excitation system abnormalities, in accordance with workplace procedures and site requirements
  22. Generator and excitation system integrity, personnel safety and continuity of supply are maintained, in accordance with workplace procedures
  23. Consultation with appropriate personnel is undertaken, in accordance with workplace procedures and site requirements
  24. Generator and excitation system is operated at optimum efficiency, in accordance with workplace procedures
  25. Generator and excitation system and combined cycle plant is monitored for normal operation to detect deviations, in accordance with workplace procedures
  26. Corrective action is taken, in accordance with workplace procedures
  27. Appropriate personnel are notified, in accordance with workplace procedures, when defects and abnormal operating conditions are detected
  28. Test system/plant operation
  29. Generator and excitation system and combined cycle plant is observed for correct operational response, in accordance with workplace procedures
  30. Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, combined cycle plant and generator and excitation system integrity or personnel safety requirements
  31. Generator and excitation system and combined cycle plant is returned to required operational status, in accordance with workplace procedures, upon completion of testing
  32. Analyse system/plant faults
  33. Corrective actions to rectify faults are determined, in accordance with workplace procedures
  34. Generator and excitation system and combined cycle plant integrity and personnel safety are maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
  35. Appropriate personnel are organised, in accordance with workplace procedures for investigation of identified operational abnormalities
  36. Complete documentation
  37. Documentation is updated, in accordance with workplace procedures