Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare work
- Run-up hydro turbine
- Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures
- Preoperational checks are carried out on hydro turbine plant, in accordance with manufacturers' recommendations, workplace procedures and site requirements
- Turbine running up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures
- Hydro turbine is monitored and observed to detect deviations from normal run up operating conditions
- Corrective actions are taken to rectify hydro turbine abnormalities, in accordance with manufacturers' recommendations and workplace procedures
- Alternator is synchronised and connected to electrical system, in accordance with workplace procedures and manufacturers' recommendations
- Alternator is loaded, in accordance with workplace procedures, manufacturers' recommendations and regulators requirements
- Test hydro turbineplant operation
- Power generation system and hydro turbine plant are observed for correct operational response, in accordance with workplace procedures
- Analyseand reportsystem faults
- Corrective action is taken, in accordance with workplace procedures
- Complete documentation
- Documentation is updated, in accordance with workplace procedures
Range Statement