Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare work
  2. Work tasks, hydro unit control and protection system and type of start requirements are identified, in accordance with workplace procedures, from appropriate personnel and documentation
  3. Hydro unit control and protection system run-up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements
  4. Inspection, preoperational tests and field preparation for hydro unit control and protection system service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  5. Hydro unit control and protection system operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  6. Sequence for recommissioning of hydro unit control and protection system is determined, in accordance with workplace procedures
  7. Operate hydrocontrol and protection system
  8. Hydro unit control and protection system is operated within limits of its' design and site requirements, in accordance with workplace procedures
  9. Hydro unit control and protection system is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions
  10. Corrective actions are taken to rectify hydro unit control and protection system abnormalities, in accordance with workplace procedures and manufacturers' recommendations
  11. Test hydro unit control and protection systemoperation
  12. Hydro unit control and protection system is observed for correct operational response, in accordance with workplace procedures
  13. Analyse hydro unit control and protection systemfaults
  14. Actions to rectify hydro unit control and protection system faults are correctly determined, in accordance with workplace procedures
  15. Monitor and inspect hydro unit control and protection system
  16. Hydro unit control and protection system is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  17. Complete documentation
  18. Documentation is updated, in accordance with workplace procedures