Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to joint and maintain de-energised HV underground paper insulated cables
- Job requirements and workplace procedures are identified and communicated with relevant personnel
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of de-energised HV underground paper insulated cables are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- WHS/OHS and environmental hazards are identified, risks are assessed and control measures identified in accordance with workplace procedures
- Relevant work permits are obtained, understood and signed in accordance with workplace procedures
- Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- Traffic management plan is confirmed as being applied in accordance with workplace procedures
- Carry out installation and maintenance of de-energised HV underground paper insulated cables
- Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- Cables are tested in accordance with workplace procedures
- Cables are prepared for jointing, terminating or maintaining in accordance with construction drawings, manufacturer instructions and workplace procedures
- Cables are jointed, terminated or maintained in accordance with construction drawings, manufacturer instructions and workplace procedures
- Unplanned events in the installation and maintenance of de-energised HV underground paper insulated cables are responded to in accordance with workplace procedures
- Quality checks of work are undertaken in accordance with workplace procedures
- Complete installation and maintenance of de-energised HV underground paper insulated cables
- WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- Relevant work permits are signed off in accordance with workplace procedures
- Work records, reports and/or documentation are completed in accordance with workplace procedures
Range Statement