Elements and Performance Criteria
- Prepare to test and verify underground distribution cable installation
- Job requirements and workplace procedures are identified and communicated with relevant personnel
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of electrical equipment (network infrastructure) are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- WHS/OHS and environmental hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures following consultation with relevant personnel
- Relevant work permits are confirmed and signed in accordance with workplace procedures
- Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- Traffic management plan is confirmed as being applied in accordance with workplace procedures
- Carry out jointing LV and HV underground polymeric cables and LV services
- Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- Systems and circuits are isolated as required, proved safe to work on in accordance with workplace procedures
- Inspection, testing and verification of LV and HV underground polymeric cables is completed safely, in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
- LV and HV underground polymeric cables and associated equipment are installed and terminated/connected in accordance with work schedule, requirements and workplace procedures
- Maintenance, including repair and/or replacement of LV and HV underground polymeric cables is carried out in accordance with work schedule, requirements and workplace procedures
- Underground cable installations and associated hardware are visually inspected and confirmed as positioned, secured and terminated/connected in accordance with requirements and workplace procedures
- Tests and/or measurements to verify cable jointing installations are determined and conducted in accordance with WHS/OHS requirements and workplace safety procedures
- Unplanned events are responded to in accordance with workplace procedures
- Quality checks of work are undertaken in accordance with instructions and workplace procedures
- Complete jointing LV and HV underground polymeric cables and LV services
- WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- Tools, equipment and surplus resources are, where appropriate, are cleaned, checked and returned to storage in accordance with workplace procedures
- Relevant work permits are signed off and cables are returned to service in accordance with workplace procedures
- Work records, reports and/or documentation are completed in accordance with workplace procedures