Elements and Performance Criteria

  1. Plan to maintain energised HV distribution overhead electrical apparatus (stick)
  2. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  3. Job requirements and workplace procedures are identified and communicated with relevant personnel
  4. Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  5. Relevant work permits are obtained and signed in accordance with workplace procedures
  6. Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  7. Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to perform work, as required
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
  10. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  11. Carry out maintenance of energised HV distribution overhead electrical apparatus (stick)
  12. Emergency response procedures are performed in accordance with job requirements and/or workplace procedures
  13. Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
  14. Auto-reclose devices and associated circuits are rendered inoperative and necessary work documentation obtained in accordance with workplace procedures
  15. Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures
  16. Remedial actions are taken to overcome shortfalls encountered in the work schedule in accordance with job requirements and workplace procedures
  17. Maintenance of energised HV overhead electrical apparatus is performed in accordance with works schedules, job requirements and workplace procedures
  18. Energised HV overhead electrical apparatus are safely installed and maintained in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  19. Solutions to unplanned events/problems are identified and actioned in accordance with workplace procedures and approval of authorised personnel
  20. Quality checks of work are undertaken in accordance with industry standards and workplace procedures
  21. Complete maintenance of energised HV distribution overhead electrical apparatus (stick)
  22. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  23. Worksite is rehabilitated, cleaned up and confirmed safe in accordance with workplace procedures
  24. Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  25. Relevant work permits are signed off and energised HV apparatus is returned to service in accordance with workplace procedures
  26. Work records, reports and/or documentation are completed in accordance with workplace procedures