Elements and Performance Criteria

  1. Prepare for installation of network infrastructure electrical equipment
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of electrical equipment (network infrastructure) are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained, understood and signed in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work is identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Install network infrastructure electrical equipment
  11. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  12. Installation of network infrastructure electrical equipment is completed in accordance with work schedule, construction plans and drawing and workplace procedures
  13. Unplanned events in the installation of electrical equipment are responded to in accordance with workplace procedures
  14. Quality checks of work are undertaken in accordance with workplace procedures
  15. Complete installation of network infrastructure electrical equipment
  16. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  17. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  18. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  19. Relevant work permits are signed off in accordance with workplace procedures
  20. Work records, reports and/or documentation are completed in accordance with workplace procedures