Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for LV field switching to a given schedule
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for LV switching are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant authority to perform work is obtained in accordance with requirements and workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Carry out LV field switching to a given schedule
  11. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  12. LV field switching to a given schedule are applied to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  13. Communications with switching control officer, or equivalent, are established and maintained during the isolation operation in accordance with workplace procedures
  14. Electrical equipment and associated circuits to be switched, including paralleling, are isolated and proved de-energised using appropriate devices and earthed, as required, in accordance with workplace procedures
  15. Unplanned events are responded to in accordance with workplace procedures
  16. Quality checks of work are undertaken in accordance with workplace procedures
  17. Complete LV field switching to a given schedule
  18. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  19. Worksite is cleaned and made safe and surplus materials are returned to storage or disposed of in accordance with workplace procedures
  20. Plant, equipment and tools are cleaned, checked and returned to service in accordance with workplace procedures
  21. Relevant work permits are signed off in accordance with workplace procedures
  22. Work records, reports and/or documentation are completed in accordance with workplace procedures