Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare for the installation and maintenance of network infrastructure electrical equipment
- Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
- Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the installation and/or maintenance of network infrastructure electrical equipment are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures
- Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear according to established procedures
- Relevant work permits are obtained to access and perform work according to requirements and/or established procedures
- Resources, including personnel, equipment, tools and personal protective equipment (PPE) required for the job are obtained and confirmed in working order
- Relevant personnel at worksite are confirmed current in first aid, pole top rescue and other related work procedures according to requirements
- Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved to carry out work, where necessary
- Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
- Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures
- Road signs, barriers and warning devices are positioned in accordance with requirements
- Carry out installation and maintenance of network infrastructure electrical equipment
- Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely followed, and currency according to requirements confirmed
- Essential knowledge and associated skills are applied in the safe installation of network infrastructure electrical equipment to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
- Electrical equipment and associated hardware are positioned, secured and terminated/connected in accordance with requirements and established procedures
- Maintenance, including repair and/or replacement of network infrastructure electrical equipment, is carried out in accordance with the work schedule and requirements/established procedures
- Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions according to established procedures
- Unplanned events in the installation of electrical equipment (network infrastructure) are undertaken within the scope of established procedures
- Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills
- Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures
- Complete the installation and maintenance of network infrastructure electrical equipment
- Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable
- Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures
- Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
- Relevant work permit(s) are signed off and electrical equipment (network infrastructure) are returned to service in accordance with requirements
- Works completion records, reports, as installed/modified drawing and/or documentation and information are finalised and processed and appropriate personnel notified
Range Statement