Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for installation and maintenance of LV overhead services and associated equipment
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures the installation and maintenance of LV overhead services and associated equipment are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained, understood and signed in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Carry out installation and maintenance of LV overhead services and associated equipment
  11. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  12. Installation and maintenance of LV overhead services and associated equipment are performed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
  13. LV overhead services and associated equipment are installed in accordance with work schedule, job requirements and workplace procedures
  14. Maintenance, including repair and/or replacement of LV overhead services and associated equipment, is assembled in accordance with construction plans, drawings and workplace procedures
  15. Unplanned events are responded to in accordance with workplace procedures
  16. Quality checks of work are undertaken in accordance with workplace procedures
  17. Complete installation and maintenance of LV overhead services and associated equipment
  18. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  19. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  20. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  21. Relevant work permits are signed off and the LV overhead services and associated equipment are returned to service in accordance with workplace procedures
  22. Work records, reports and/or documentation are completed in accordance with workplace procedures