Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare for installation and replacement of energy meters and associated equipment
- Job requirements and workplace procedures are identified and communicated with relevant personnel
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and replacement of energy meters and associated equipment are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- Traffic management plan is confirmed as being applied in accordance with workplace procedures
- Carry out the installation and replacement of energy meters and associated equipment
- Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- Installation and replacement of energy meters and associated equipment are performed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
- Installation and/or replacement of energy meters and associated equipment is performed, including required wiring, testing, programming and sealing of meters and associated equipment, in accordance with job requirements and workplace procedures
- Unplanned events are responded to in accordance with workplace procedures
- Quality checks of work are undertaken in accordance with workplace procedures
- Complete the installation and replacement of energy meters and associated equipment
- WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- Work records, reports and/or documentation are completed in accordance with workplace procedures
Range Statement