Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to develop engineering solution for energy supply system protection problems
  2. Established WHS/OHS risk control measures and procedures in preparation for the work are followed
  3. The extent of the protection problem is determined from performance specifications and situation reports and in consultation with relevant personnel
  4. Activities are planned to meet scheduled timelines in consultation with others involved in the work
  5. Effective strategies are formed to ensure solution development and implementation is carried out efficiently
  6. Develop engineering solution for energy supply system protection
  7. Knowledge of supply system protection arrangements, operation, device characteristics and applications are applied to developing solutions to supply system protection problems
  8. Parameters, specifications and performance requirements in relation to each protection problem are obtained in accordance with established procedures
  9. Approaches to resolving supply system protection problems are analysed to provide most effective solutions
  10. Unplanned events are dealt with safely and effectively consistent with regulatory requirements and enterprise policies
  11. Quality of work is monitored against personal performance agreement and/or established organisational or professional standards
  12. Test, document and implement engineering solution for energy supply system protection problems
  13. Adopted solutions are documented, including instruction for their implementation that incorporates risk control measure to be followed
  14. Appropriately competent and qualified person/s required to implement solutions to supply system protection problems is coordinated in accordance with regulatory requirements and enterprise policies
  15. Justification for solutions used to solve supply system protection problems is documented for inclusion in work/project development records in accordance with professional standards
  16. Note: A license to practice in the workplace is required for work involving direct access to plant and equipment connected to installation wiring at voltages above 50 V a.c. or 120 V d.c