Elements and Performance Criteria
- Prepare to install traction bonds
- Job requirements and workplace procedures are identified and communicated with relevant personnel
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of traction bonds are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures
- Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures
- Traffic management plan is confirmed as being applied in accordance with workplace procedures
- Environmental constraints applicable to work are identified and control measures applied
- Perform installation of traction bonds
- Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures
- Installation of traction bonds and bonding cables are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
- Cable and surrounds, including rail and other surfaces, are prepared for jointing and terminating in accordance with workplace procedures
- Traction bonds are installed and tested in accordance with job requirements and workplace procedures
- Unplanned events are responded to in accordance with workplace procedures
- Quality checks of work are undertaken in accordance with workplace procedures
- Complete installation of traction bonds
- Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- Relevant work permits are signed off and, the system that has undergone the installation of a traction bond/s is returned to service in accordance with workplace procedures
- Work records, reports and/or documentation are completed in accordance with workplace procedures
Range Statement