Elements and Performance Criteria
- Prepare for installation of overhead traction equipment/components
- Job requirements and workplace procedures are identified and communicated with relevant personnel
- Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of overhead traction equipment/components are obtained and confirmed for the purposes of the work to be performed
- Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures
- Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures
- Road/rail management plan is identified and implemented in accordance with workplace procedures
- Environmental constraints applicable to work are identified and control measures applied
- Perform installation of overhead traction equipment/components
- Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures
- Installation of overhead traction equipment/components are completed in agreed timeframes, to quality standards and with minimum of waste in accordance with job requirements and workplace procedures
- Electrical components/equipment and associated hardware are positioned, secured and terminated/connected in accordance with job requirements and workplace procedures
- Unplanned events are responded to in accordance with workplace procedures
- Quality checks of work are undertaken in accordance with workplace procedures
- Complete installation of overhead traction equipment/components
- Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- Relevant work permits are signed off and overhead traction equipment/components are commissioned in accordance with workplace procedures
- Work records, reports and/or documentation are completed in accordance with workplace procedures