Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for installation of overhead traction equipment/components
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation of overhead traction equipment/components are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures
  7. Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures
  9. Road/rail management plan is identified and implemented in accordance with workplace procedures
  10. Environmental constraints applicable to work are identified and control measures applied
  11. Perform installation of overhead traction equipment/components
  12. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  13. Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures
  14. Installation of overhead traction equipment/components are completed in agreed timeframes, to quality standards and with minimum of waste in accordance with job requirements and workplace procedures
  15. Electrical components/equipment and associated hardware are positioned, secured and terminated/connected in accordance with job requirements and workplace procedures
  16. Unplanned events are responded to in accordance with workplace procedures
  17. Quality checks of work are undertaken in accordance with workplace procedures
  18. Complete installation of overhead traction equipment/components
  19. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  20. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  21. Relevant work permits are signed off and overhead traction equipment/components are commissioned in accordance with workplace procedures
  22. Work records, reports and/or documentation are completed in accordance with workplace procedures