Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for maintenance of overhead traction equipment/components
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the maintenance of overhead traction equipment/components are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained, understood and signed in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Environmental constraints applicable to work are identified and control measures applied
  11. Perform maintenance of overhead traction equipment/components
  12. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  13. Systems and circuits are checked, isolated and proved safe to work on in accordance with workplace procedures
  14. Maintenance of overhead traction equipment/components are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  15. Electrical components/equipment and associated hardware are confirmed as operating within normal operating parameters and in accordance with workplace procedures
  16. Maintenance, including repair and/or replacement of overhead traction equipment/components, is in accordance with construction plans, drawings and workplace procedures
  17. Unplanned events are responded to in accordance with workplace procedures
  18. Quality checks of work, including visual inspections, are undertaken in accordance with workplace procedures
  19. Complete maintenance of overhead traction equipment/components
  20. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  21. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  22. Relevant work permits are signed off after final inspections and the system is energised, tested and returned to service in accordance with workplace procedures
  23. Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified