Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare for the installation and maintenance of traction network equipment/components
- Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
- Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the installation and maintenance of overhead traction equipment/components are obtained and confirmed for the purposes of the work to be performed and communicated to relevant personnel
- Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures
- Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear, according to established procedures
- Relevant work permits are obtained to access and perform work according to requirements and/or established procedures
- Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order
- Relevant personnel at worksite are confirmed current in cardiopulmonary resuscitation (CPR), first aid, and other rescue procedures according to requirements
- Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary
- Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
- Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed where applicable in accordance with established procedures
- Rail/road signs, barriers and warning devices are positioned in accordance with requirements
- Environmental constraints applicable to work are identified and control measures applied
- Carry out the installation and maintenance of traction network equipment/components
- Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices are safely followed and currency according to requirements confirmed
- Systems and circuits are isolated as required, proved safe to work on in accordance with the requirements/permits and established procedures
- Essential knowledge and associated skills are applied in the safe installation of overhead traction equipment/components to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
- Electrical components/equipment and associated hardware are positioned, secured and terminated/connected in accordance with requirements and established procedures
- Electrical component/equipment and associated hardware is ascertained as operating within normal operating parameters and in accordance with requirements and established procedures
- Maintenance, including repair and/or replacement of overhead traction equipment/components, is carried out in accordance with the work schedule and requirements/established procedures
- Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions according to established procedures
- Unplanned events during the installation of overhead traction equipment/components are responded to within the scope of established procedures
- Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills
- Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures
- Complete the installation and maintenance of traction network equipment/components
- Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures
- Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
- Relevant work permits are signed off after final inspections and the system is energised, tested and returned to service in accordance with requirements
- Work completion records, reports, as installed//modified drawings and/or documentation and information are finalised and processed and appropriate personnel notified
Range Statement