Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan to maintain HV power system circuit breakers
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Risk control measures are identified, prioritised, implemented and evaluated against the work schedule
  6. Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  7. Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required
  8. Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
  9. Worksite is prepared in accordance with the work schedule and to minimise risk and damage to property and personnel in accordance with established procedures
  10. Carry out maintenance on HV power system circuit breakers
  11. Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures
  12. Safe working documentation is acquired and requirements completed in accordance with established procedures
  13. Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
  14. Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with established procedures
  15. Essential knowledge and associated skills are applied for the safe maintenance of HV power system circuit breakers and maintained to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  16. Maintenance of HV power system circuit breakers is performed in accordance with work schedules, job requirements and workplace procedures
  17. Maintenance of HV power system circuit breakers is completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
  18. Unplanned events or conditions are responded to in accordance with established procedures
  19. Complete the maintenance of HV power system circuit breakers
  20. Safe working documentation is surrendered and HV power system circuit breakers are made ready for service in accordance with workplace procedures
  21. Worksite is cleaned and confirmed safe in accordance with workplace procedures
  22. Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  23. Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified