Elements and Performance Criteria

  1. Plan to maintain high current d.c. switchgear and equipment
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear, to ensure safe systems of work are followed and in accordance with workplace procedures
  4. Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others and for completion within acceptable timeframes, to agreed quality standards and in accordance with workplace procedures
  5. Risk control measures are identified, prioritised, implemented and evaluated against the work schedule
  6. Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  7. Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required
  8. Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
  9. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  10. Carry out the maintenance of high current d.c. switchgear and equipment
  11. Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures
  12. Safe working documentation is acquired and requirements completed in accordance with workplace procedures
  13. Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
  14. Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to the immediate authorised persons for directions in accordance with workplace procedures
  15. Maintenance and repair of high current d.c. switchgear and equipment are maintained and repaired in accordance with works schedules, job requirements and workplace procedures
  16. High current d.c. switchgear and equipment are safely maintained to ensure completion in agreed timeframes, to quality standards and minimum waste in accordance with workplace procedures
  17. Unplanned events or conditions are responded to in accordance with workplace procedures
  18. Complete the maintenance of high current d.c. switchgear and equipment
  19. Safe working documentation is surrendered and equipment made ready for service
  20. Worksite is cleaned and confirmed safe in accordance with workplace procedures
  21. Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  22. Work records, reports and/or documentation are completed in accordance with workplace procedures and relevant personnel notified