  1. Prepare for substation switching to given schedule
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for substation switching are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures
  6. Relevant authority is obtained to access and perform switching in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work is identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Carry out substation switching to given schedule
  11. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  12. Substation switching to given schedule are applied to ensure completion in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
  13. Communications with switching control officer are established and maintained throughout isolation operation in accordance with workplace procedures
  14. Electrical equipment, associated circuits, line/network or worksite to be switched is isolated and checked as de-energised using appropriate devices, earthed, where required, and load transferred in accordance with job requirements and workplace procedures
  15. Substation switching to a given schedule is performed in accordance with work schedule, job requirements and workplace procedures
  16. Unplanned events are responded to in accordance with workplace procedures
  17. Relevant work permits are prepared and issued in accordance with workplace procedures
  18. Quality checks of work are undertaken in accordance with workplace procedures
  19. Complete substation switching to given schedule
  20. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  21. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  22. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  23. Relevant work permits are signed off, safety devices are removed, and the system is re-energised and returned to service in accordance with workplace procedures