Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to install transmission structures and associated hardware
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for erecting towers and associated hardware are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks are assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are confirmed and signed in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  9. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  10. Carry out the erection of transmission towers and associated hardware
  11. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  12. Transmission structures and associated hardware are assembled at ground level and erected in accordance with construction plans, drawings and workplace procedures
  13. Structure is stabilised in accordance with construction plans, drawings and workplace procedures
  14. Unplanned events are responded to in accordance with workplace procedures
  15. Quality checks of work are undertaken in accordance with workplace procedures
  16. Complete installation of transmission structures and associated hardware
  17. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  18. Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  19. Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
  20. Relevant work permits are signed off and towers and associated hardware are returned to service in accordance with workplace procedures
  21. Work records, reports and/or documentation are completed in accordance with workplace procedures