Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare/plan for the installation and maintenance of transmission network infrastructure
  2. Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
  3. Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the installation and maintenance of transmission network infrastructure are obtained and confirmed for the purposes of the work to be performed and communicated to relevant personnel
  4. Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear, according to established procedures
  6. Relevant work permits are obtained to access and perform work according to requirements and/or established procedures
  7. Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order
  8. Relevant personnel at worksite are confirmed current in first aid, tower/pole top rescue and other related work procedures according to requirements
  9. Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved to carry out work, where necessary
  10. Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures
  11. Site is prepared according to the work schedule and to minimise risk and damage to property, commerce,] and individuals in accordance with established procedures
  12. Traffic management plan is identified and implemented
  13. Carry out the installation and maintenance of transmission network infrastructure
  14. Lifting, climbing, working aloft, and use of power tools/equipment, techniques and practices are safely followed and currency according to requirements confirmed
  15. Systems and circuits are isolated as required, proved safe to work on in accordance with the requirements/permits and established procedures
  16. Essential knowledge and associated skills are applied in the safe installation and maintenance of transmission network infrastructure to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
  17. Poles and/or structures and their associated hardware to be installed are stabilised according to requirements
  18. Installation of poles and/or structures is carried out in accordance with the work schedule and requirements/established procedures
  19. Towers and associated hardware to be erected are stabilised according to requirements
  20. Maintenance, including repair and/or replacement of poles and/or structures, is carried out in accordance with the work schedule and requirements/established procedures
  21. Overhead conductor/cables are strung, tensioned and terminated in accordance with requirements/established procedures
  22. Conductors and anti-vibration devices, spaces/spreaders are secured in accordance with established procedures
  23. Electrical connections are made in accordance with requirements/established procedures
  24. Maintenance, including repair and/or replacement of overhead conductors and cables used on towers, is carried out in accordance with the work schedule and requirements/established procedures
  25. Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks reported to immediate authorised personnel for directions according to established procedures
  26. Erection of towers and associated hardware is carried out in accordance with the work schedule and requirements/established procedures
  27. Unplanned events in the erection of towers and associated hardware are undertaken within the scope of established procedures
  28. Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills
  29. Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures
  30. Complete the installation and maintenance of transmission network infrastructure
  31. Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable
  32. Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures
  33. Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage or disposed of in accordance with established procedures
  34. Relevant work permits are signed off and the transmission network infrastructure is returned to service in accordance with requirements
  35. Works completion records, reports, as installed/modified drawings and/or documentation and information are finalised and processed and appropriate personnel notified