Statement of Attainment
These competencies from the LMF02 Training Packages meet the minimum industry requirements for installation/fabrication of Insulated Glass Units (IGUs).
These competencies from the LMF02 Training Packages meet the minimum industry requirements for installation/fabrication of Insulated Glass Units (IGUs).
This Skill Set is aimed at people who have completed a qualification in Glass and Glazing or other aligned trades at a Certificate III level and who are now expected to install and/or fabricate Insulated Glass Units that conform with the Australian Standard "AS4666 Insulated Glass Units" to meet certification requirements. Note that it is expected any prerequisite requirements (or their equivalent) will have already been achieved.
The SS2 Insulated Glass Unit (IGU) Installer_Fabricator consists of:
LMFGG3001C Store and handle glass
LMFGG2009C Fabricate and assemble metal frames
LMFGG3016C Fabricate and install residential windows and doors
LMFGG3017C Fabricate and install commercial glazing
MSACMT251A Apply quality standards
These competencies can provide credit towards relevant qualifications in the Furnishing Training Package at a Certificate III level and could be used towards a relevant Certificate IV.