Change log for ZBE02
ZBE02 unit update log
- ZBECOR0304A
- Use materials and process knowledge to assist in plastering operations, updated 2013-09-29
- ZBEPOP0319A
- Use mechanical jointing equipment to finish joints, updated 2013-09-29
- ZBEPOP0307A
- Install batt insulation products, updated 2013-09-29
- ZBEMHA0302A
- Use manual handling equipment to manoeuvre plaster products, updated 2013-09-29
- ZBESBU0401A
- Manage employee performance, updated 2013-09-29
- ZBECOR0301A
- Implement Occupational Health and Safety Procedures, updated 2013-09-29
- ZBEPOP0309A
- Install and finish columns, updated 2013-09-29
- ZBEPOP0320A
- Finish Category 1 & 2 wet areas, updated 2013-09-29
- ZBEPOP0404A
- Apply BCA and Australian Standards to systems installation and inspection, updated 2013-09-29
- ZBEWPO0302A
- Plan travel routes, updated 2013-09-29
- ZBEPOP0318A
- Install and fix residential fire rated plaster products, updated 2013-09-29
- ZBEPOP0315A
- Install partiwall plaster products, updated 2013-09-29
- ZBEPOP0317A
- Install and fix residential acoustic rated plaster products, updated 2013-09-29
- ZBESBU0407A
- Lead workgroup, updated 2013-09-29
- ZBEPOP0321A
- Set out and shape arches, updated 2013-09-29
- ZBEPOP0316A
- Match mitre and install cast ornamental cornice, updated 2013-09-29
- ZBESBU0406A
- Introduce new team members, updated 2013-09-29
- ZBECOR0303A
- Conduct work site housekeeping and maintain environmental controls, updated 2013-09-29
- ZBECOR0302A
- Monitor on site Occupational Health and Safety Compliance, updated 2013-09-29
- ZBEPOP0313A
- Use vacuum/electric sanding equipment to finish plaster work, updated 2013-09-29
- ZBECOR0305A
- Complete Workplace Induction, updated 2013-09-29
- ZBEMHA0301A
- Load and unload plaster and plaster related products, updated 2013-09-29
- ZBEPOP0308A
- Fix fibre cement board, updated 2013-09-29
- ZBEPOP0304A
- Fix wet area plaster sheets, updated 2013-09-29
- ZBEPOP0305A
- Fix ceilings to external protected areas., updated 2013-09-29
- ZBEPOP0401A
- Plan and co-ordinate site operations, updated 2013-09-29
- ZBEPOP0311A
- Rectify faults in plaster applications, updated 2013-09-29
- ZBECOR0306A
- Work safely at heights, updated 2013-09-29
- ZBEWPO0305A
- Set up, move and dismantle scaffolding up to 4 meters, updated 2013-09-29
- ZBEPOP0314A
- Hand sand plaster work, updated 2013-09-29
- ZBEPOP0310A
- Finish plasterboard joins by hand, updated 2013-09-29
- ZBESBU0405A
- Quote for work, updated 2013-09-29
- ZBEPOP0301A
- Fix standard plasterboard wall sheets, updated 2013-09-29
- ZBEPOP0303A
- Fix Battens, updated 2013-09-29
- ZBECCA0301A
- Complete workplace calculations, updated 2013-09-29
- ZBEPOP0312A
- Cut and fix paper faced cornice, updated 2013-09-29
- ZBECOR0307A
- Work within the quality system, updated 2013-09-29
- ZBEPOP0403A
- Conduct interior lining completion inspections, updated 2013-09-29
- ZBEPOP0306A
- Fix curved wall systems, updated 2013-09-29
- ZBEWPO0301A
- Provide quality service to customers, updated 2013-09-29
- ZBECOR0308A
- Apply levels of finish standards to planning and inspection of own work., updated 2013-09-29
- ZBEWPO0304A
- Inspect equipment for serviceability, updated 2013-09-29
- ZBEWPO0303A
- Erect and maintain trestle and plank systems, updated 2013-09-29
- ZBEPOP0402A
- Diagnose faults in finished interior lining work, updated 2013-09-29
- ZBEPOP0302A
- Fix standard plasterboard ceiling sheets, updated 2013-09-29
- ZBEOHS0401A
- Complete on site risk assessment and control procedures, updated 2013-09-29
- ZBECCA0302A
- Maintain records, updated 2013-09-29
- ZBESBU0404A
- Purchase materials and equipment, updated 2013-09-29
- ZBECOR0309A
- Mix plastering compounds, updated 2013-09-29
- ZBECCA0303A
- Plan a personal budget, updated 2013-09-29
- ZBESBU0402A
- Respond to customer complaints, updated 2013-09-29
- ZBEMHA0303A
- Store plasterboard/products, updated 2013-09-29
- ZBESBU0403A
- Co-ordinate Contractor performance, updated 2013-09-29
- ZBECOR0310A
- Measure work and plan materials use, updated 2013-09-29