Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCPER420 Mapping and Delivery Guide
Design an urban permaculture system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency AHCPER420 - Design an urban permaculture system
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Develop a design brief for an urban permaculture system
  • Consult with client and determine design objectives for an urban permaculture system
  • Determine design context
  • Develop and confirm design brief with client
  • Negotiate and confirm budget and timelines for design development
       
Element: Undertake design analysis
  • Access maps, images and geospatial data for site
  • Survey site for Zones 1 and 2 and confirm or supplement information of maps and images
  • Prepare a site base plan
  • Record site survey data on site plan
  • Conduct a neighbourhood and bioregional analysis for site
       
Element: Prepare a design concept
  • Determine and evaluate a concept for an urban permaculture system
  • Prepare concept design drawings
  • Identify and document plant and livestock suitable for concept design in an urban setting
  • Prepare a preliminary budget for design concept
  • Present the concept plan and budget to client for feedback and approval
  • Review concept plan and budget according to client feedback
  • Design an urban permaculture system according to design brief and approved concept plan and budget
  • Produce drawings and specifications for urban permaculture system
  • Present design plans, drawings and specifications to client for final feedback and approval
  • Undertake final revision changes for design according to client feedback and approvals
  • Finalise and record design according to workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Consult with client and determine design objectives for an urban permaculture system 
Determine design context 
Develop and confirm design brief with client 
Negotiate and confirm budget and timelines for design development 
Access maps, images and geospatial data for site 
Survey site for Zones 1 and 2 and confirm or supplement information of maps and images 
Prepare a site base plan 
Record site survey data on site plan 
Conduct a neighbourhood and bioregional analysis for site 
Determine and evaluate a concept for an urban permaculture system 
Prepare concept design drawings 
Identify and document plant and livestock suitable for concept design in an urban setting 
Prepare a preliminary budget for design concept 
Present the concept plan and budget to client for feedback and approval 
Review concept plan and budget according to client feedback 
Design an urban permaculture system according to design brief and approved concept plan and budget 
Produce drawings and specifications for urban permaculture system 
Present design plans, drawings and specifications to client for final feedback and approval 
Undertake final revision changes for design according to client feedback and approvals 
Finalise and record design according to workplace procedures 

Forms

Assessment Cover Sheet

AHCPER420 - Design an urban permaculture system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCPER420 - Design an urban permaculture system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: