Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AURTTL3010 Mapping and Delivery Guide
Install LPG, CNG and LNG electrical control equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency AURTTL3010 - Install LPG, CNG and LNG electrical control equipment
Description This unit describes the performance outcomes required to install Liquefied Petroleum Gas (LPG), Compressed Natural Gas (CNG) and Liquefied Natural Gas (LNG) electrical control equipment. It involves identification and confirmation of work requirement, preparation for work, installation of LPG, CNG and LNG electrical control equipment, testing of installed equipment and completion of work finalisation processes, including clean-up and documentation.Licencing, legislative, regulatory or certification requirements may apply to this unit in some jurisdictions. Users are advised to check with the relevant regulatory authority.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application Work applies to the LPG, CNG and LNG electrical control equipment of light vehicles, heavy commercial vehicles, and vehicles in the mining, construction and agricultural environments.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable. Not applicable.
Competency Field Technical - Alternative fuels
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install electrical control equipment
  • Workplace instructions are used to determine job requirements
  • Workplace health and safety (WHS) requirements relating to LPG, CNG and LNG fuel systems are observed and applied throughout the work
  • Procedures and information are sourced and interpreted
  • Method options are analysed and those most appropriate to the circumstances are selected
  • Appropriate tools and equipment are selected and prepared
       
Element: Carry out installation
  • Installation is performed according to workplace procedures and manufacturer and component supplier specifications and without causing damage to components or systems
  • Adjustments are made according to workplace procedures and manufacturer and component supplier specifications
       
Element: Conduct post-installation tests and analyse results
  • Testing is carried out according to workplace procedures and manufacturer and component supplier specifications
  • Test results are compared with manufacturer and component supplier specifications to indicate compliance or non-compliance
  • Results are documented according to workplace procedures, including recommendations for necessary repairs or adjustments
       
Element: Clean up work area and finalise work processes
  • Final inspection is made to ensure work is to workplace expectations and vehicle is presented ready for use
  • Tools and equipment are checked and stored according to workplace expectations
  • Workplace and installation documentation is processed according to workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy all of the requirements of the performance criteria and required skills and knowledge.

A person who demonstrates competency in this unit must be able to:

observe safety procedures and requirements

select methods and techniques appropriate to the circumstances

conduct the installation and testing of a range of LPG, CNG or LNG electrical control equipment according to workplace, manufacturer and component supplier requirements

interpret and record test results

present vehicle in a condition that complies with workplace requirements.

Context of, and specific resources for assessment

Competency is to be assessed in the workplace or a simulated workplace environment that accurately reflects performance in a real workplace setting.

Assessment is to occur:

using standard workplace practices and procedures

following safety requirements

applying environmental constraints.

Assessment is to comply with relevant:

regulatory requirements

Australian standards

industry codes of practice.

The following resources must be made available for the assessment of this unit:

workplace location or simulated workplace

vehicles that require the fitment of gas system electrical control equipment

material relevant to installing gas system electrical control equipment

equipment, hand and power tools appropriate to installing gas system electrical control equipment

specifications and workplace instructions.

Method of assessment

Assessment must satisfy the endorsed Assessment Guidelines of this Training Package.

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with the application of required skills and knowledge.

Assessment methods must be by direct observation of tasks and include questioning on required skills and knowledge to ensure correct interpretation and application.

Competence in this unit may be assessed in conjunction with other units which together form part of a holistic work role.

Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate the needs of diverse clients.

Assessment processes and techniques must be culturally sensitive and appropriate to the language, literacy and numeracy capacity of the candidate and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

communication skills to:

clarify workplace instructions and determine job requirements

gain information from appropriate persons and assistance as required

initiative and enterprise to identify installation problems and to suggest possible solutions

learning skills to:

identify sources of information, assistance and expert knowledge to expand knowledge, skills and understanding

literacy skills to:

read and follow information on written job instructions, specifications, standard operating procedures, charts, lists, drawings and other applicable reference documents

obtain and record measurements

document repairs and parts required

numeracy skills to:

apply accurate measurements and adjustments

interpret instruments, gauges and measuring equipment

planning and organising skills to:

plan own work requirements and prioritise actions to achieve required outcomes and ensure tasks are completed on time

identify risk factors and take action to minimise risk

problem-solving skills to:

recognise a workplace problem or a potential problem and take action

refer problems outside area of responsibility to appropriate person and suggest possible causes

seek information and assistance as required to solve problems

self-management skills to:

select and use appropriate equipment, materials, processes and procedures

recognise limitations and seek timely advice

teamwork skills to apply knowledge of own role to complete activities efficiently to support team activities and tasks

technical skills to use workplace tools relating to the installation of LPG, CNG and LNG fuel system electrical control equipment, including the use of specialised tools and equipment

technology skills to:

operate diagnostic and test equipment

use technology to collect, analyse and provide information.

Required knowledge

WHS regulations, requirements, equipment and material, and personal safety requirements relating to installing LPG, CNG and LNG fuel system electrical control equipment

dangers of working with gas systems

operating principles of LPG/CNG/LNG control systems and their relationship to the individual gas system and other associated systems

installation procedures for LPG/CNG/LNG electrical control equipment

post-installation testing procedures for LPG/CNG/LNG electrical control equipment

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Workplace instructions may include:

computer-generated instructions

verbal instructions

written instructions.

Job requirements may include:

LPG, CNG and LNG fuel system electrical control equipment installation methods, processes and equipment

Workplace health and safety (WHS) requirements:

are those prescribed under legislation, regulations, codes of practice, and workplace policies and procedures

may include:

protective clothing and equipment

use of tools and equipment

handling of material

use of fire-fighting equipment

first aid equipment

hazard control, including control of hazardous materials and toxic substances.

Procedures and information may include:

verbal, written and graphical instructions

signage

work schedules, plans and specifications

work bulletins or memos

material safety data sheets (MSDS)

diagrams or sketches

safe work procedures relating to the installation of LPG, CNG and LNG fuel system electrical control equipment

regulatory and legislative requirements relating to the automotive industry

Australian Design Rules

Engineer’s design specifications and instructions

organisational work specifications and requirements

instructions issued by authorised workplace or external persons

Australian standards

vehicle service requirements and repair manuals.

Adjustments may include:

integrating the electrical control system into the existing wiring loom

changes to the wiring loom length and configuration

changes to the fuel system configuration

changes to the air intake system configuration.

Tests may include:

testing for electrical continuity, resistance, shorts to ground, voltage drop

verifying correct operation of associated vehicle systems

gas leakage checks.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Workplace instructions are used to determine job requirements 
Workplace health and safety (WHS) requirements relating to LPG, CNG and LNG fuel systems are observed and applied throughout the work 
Procedures and information are sourced and interpreted 
Method options are analysed and those most appropriate to the circumstances are selected 
Appropriate tools and equipment are selected and prepared 
Installation is performed according to workplace procedures and manufacturer and component supplier specifications and without causing damage to components or systems 
Adjustments are made according to workplace procedures and manufacturer and component supplier specifications 
Testing is carried out according to workplace procedures and manufacturer and component supplier specifications 
Test results are compared with manufacturer and component supplier specifications to indicate compliance or non-compliance 
Results are documented according to workplace procedures, including recommendations for necessary repairs or adjustments 
Final inspection is made to ensure work is to workplace expectations and vehicle is presented ready for use 
Tools and equipment are checked and stored according to workplace expectations 
Workplace and installation documentation is processed according to workplace procedures 

Forms

Assessment Cover Sheet

AURTTL3010 - Install LPG, CNG and LNG electrical control equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AURTTL3010 - Install LPG, CNG and LNG electrical control equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: