Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
AVIY0071 Mapping and Delivery Guide
Pilot a helicopter during hoisting operations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | AVIY0071 - Pilot a helicopter during hoisting operations |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to pilot a helicopter during hoisting operations in compliance with relevant regulatory requirements of the Civil Aviation Safety Authority (CASA) and national operating standards.It includes planning hoisting operations, conducting pre-flight briefings for hoisting operations, and operating a helicopter during hoisting operations. It also includes managing abnormal and emergency situations during hoisting operations, and conducting post-flight briefings for hoisting operations.This unit addresses aviation technical skill requirements (physical, mental and task-management abilities) related to aircraft operational duties of flight crew and contributes to safe and effective performance in complex aviation operational environments.Operations are conducted as part of recreational, commercial and military aircraft activities across a variety of operational contexts within the Australian aviation industry.Work is performed independently or under limited supervision within a single-pilot or multi-crew environment.Licensing, legislative, regulatory or certification requirements are applicable to this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Y – Aircraft Operation and Traffic Management |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan hoisting operations |
| |||||||
Element: Crew and equipment required to ensure safe achievement of task are determined | ||||||||
Element: Helicopter performance data is interpreted and calculated to ensure suitability of aircraft for operations | ||||||||
Element: Transit, hoisting operation communications and recovery are planned in accordance with workplace procedures | ||||||||
Element: Operations at hoist site, including consideration of obstructions, terrain and any factors that may adversely affect lift, are planned | ||||||||
Element: Abnormal and emergency hoisting situation contingency procedures are planned | ||||||||
Element: Conduct pre-flight briefings |
| |||||||
Element: Location, terrain features (sea state as required) and forecast weather conditions are obtained and confirmed with relevant personnel | ||||||||
Element: Timings, route/s, airspeeds and altitudes are confirmed with relevant personnel | ||||||||
Element: Relevant personnel are briefed about pilot, crew and hoisting personnel responsibilities and communication procedures | ||||||||
Element: Abnormal and emergency hoisting situation contingency procedures are briefed | ||||||||
Element: Operate a helicopter during hoisting operations |
| |||||||
Element: Site inspection, approach and hover heading are determined in accordance with operational requirements | ||||||||
Element: Descent and approach are controlled to terminate over hoist site | ||||||||
Element: Control is applied to helicopter to maintain position over hoist site | ||||||||
Element: Obstacle clearances to obstructions, constructions and terrain are maintained during deployment and retrieval operation | ||||||||
Element: Effective communications with crew and relevant personnel are maintained during operation | ||||||||
Element: Safety and security of passengers and/or cargo is managed | ||||||||
Element: Hoist cable is recovered and stowed, and site is vacated in accordance with workplace procedures | ||||||||
Element: Manage abnormal and emergency situations |
| |||||||
Element: Abnormal and/or emergency situations are identified and managed | ||||||||
Element: Hoist cargo/personnel are safely jettisoned (as required) when flight safety or hover stability is compromised | ||||||||
Element: Conduct post-flight briefings |
| |||||||
Element: Effectiveness, efficiency and performance of equipment are analysed and reported | ||||||||
Element: Inspection, servicing and stowage of hoist equipment are organised/confirmed |