Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
AVIY3078A Mapping and Delivery Guide
Manage remote pilot aircraft systems (RPA) energy source requirements
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | AVIY3078A - Manage remote pilot aircraft systems (RPA) energy source requirements |
---|---|---|---|
Description | This unit involves the skills and knowledge required to manage remote pilot aircraft systems (RPA) energy source, including determining RPA energy source requirements and performing the necessary calculations, refueling the RPA where appropriate and ensuring the energy source system is configured and operated for maximum safety and efficiency in the prevailing flight conditions.It also includes calculating requirements, configuring the energy source system and making adjustments to achieve best range and best endurance within prescribed safety parameters. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | Work must be carried out in compliance with the relevant licence and RPAS rating requirements of the Civil Aviation Safety Authority (CASA); relevant airspace control requirements; Visual Meteorological Conditions (VMC); regulations, safety codes, protocols and procedures relevant to managing an RPA energy source.Use for Defence Aviation is to be in accordance with relevant Defence Orders and Instructions Operations are conducted across a variety of operational contexts within the Australian Aviation Industry.Work is performed under limited supervision. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Nil. | ||
Competency Field | Y - Aircraft Operation and Traffic Management |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan energy source requirements |
| |||||||
Element: Manage energy source system |
| |||||||
Element: Refuel/recharge RPA |
|