Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCCLRG4001 Mapping and Delivery Guide
Licence to perform rigging advanced level
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCCLRG4001 - Licence to perform rigging advanced level |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Set up task. |
| |||||||
Element: Complete task. |
| |||||||
Element: Obtain and interpret information, including safe work method statements (SWMSs), required to ensure that activities are performed in compliance with workplace-specific and safe work requirements. | ||||||||
Element: Obtain and interpret information required to ensure that equipment inspection, use, maintenance and storage complies with manufacturer requirements. | ||||||||
Element: Identify workplace and task-specific hazards and determine required risk controls and safety measures and equipment, including signs and barricades, personal protective equipment (PPE), and fall prevention and fall arrest equipment. | ||||||||
Element: Identify methods of moving and placing tools, equipment and materials to minimise the risk of falling objects, to avoid inappropriate carrying on ladders and to minimise hazardous manual tasks. | ||||||||
Element: Identify required rigging equipment and associated gear. | ||||||||
Element: Calculate loads associated with mechanical load shifting equipment and associated gear required to erect and dismantle structures and plant. | ||||||||
Element: Establish communication methods with associated personnel. | ||||||||
Element: Select and inspect equipment. |
| |||||||
Element: Select rigging equipment and associated gear, inspect for defects, and isolate, tag out, report and record defective items. | ||||||||
Element: Select communication equipment and check that it is working and fit for use. |
| |||||||
Element: Ensure risk controls and safety measures and equipment have been put in place, including the fitting, adjusting and anchoring of fall protection equipment. | ||||||||
Element: Consult with relevant persons to ensure that ground and foundation have been assessed as suitable for task. | ||||||||
Element: Consult with relevant persons to ensure that the structure has been assessed as suitable for load bearing task. | ||||||||
Element: Undertake advanced rigging activities. |
| |||||||
Element: Erect gin poles or sheer legs, operate winch to move load, and dismantle. | ||||||||
Element: Erect flying fox or cable way, operate to move a load, and dismantle. | ||||||||
Element: Erect guyed derrick, operate to move a load, and dismantle. | ||||||||
Element: Erect, operate and dismantle suspended scaffold. | ||||||||
Element: Install and remove fabricated hung scaffold. |
| |||||||
Element: Inspect structures, plant, equipment and gear for defects, and isolate, tag out and report defective items. | ||||||||
Element: Store plant, equipment and gear in accordance with workplace requirements. | ||||||||
Element: Remove risk controls safety measures and equipment. | ||||||||
Element: Complete handover certificates, and attach scaffolding tags for suspended scaffold and hung scaffold. |