Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCCWP5001 Mapping and Delivery Guide
Design below ground waterproofing
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCCWP5001 - Design below ground waterproofing |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare. |
| |||||||
Element: Carry out design. |
| |||||||
Element: Determine site conditions and plan a basement waterproofing brief in consultation with all stakeholders identifying challenges and waterproofing system design requirements. | ||||||||
Element: Assess types of construction proposed and their permeability to water and moisture, including concrete, masonry and framing to be managed and identify potential water ingress points. | ||||||||
Element: Review drainage system requirements in accordance with the design team. | ||||||||
Element: Carry out risk analysis. |
| |||||||
Element: Assess risks of possible defects in the waterproofing system. | ||||||||
Element: Assess consequence of water and moisture ingress into an area of the basement. | ||||||||
Element: Determine the risk of internal condensation and control measures with the design team. | ||||||||
Element: Determine feasibility of the proposed waterproofing design for the structure and the construction sequence. | ||||||||
Element: Review any requirement for repair and maintenance of the waterproofing system post construction. | ||||||||
Element: Analyse site environmental conditions according to approved plans, including surface and sub-surface drainage. |
| |||||||
Element: Provide a basement waterproofing requirement and specification in accordance with the agreed waterproofing design brief and stakeholder needs. | ||||||||
Element: Carry out a review of and ensure compliance with relevant regulations, National Construction Code (NCC) performance requirements, Australian Standards, work health and safety (WHS), environmental requirements and manufacturers’ requirements. | ||||||||
Element: Carry out a safety in design analysis of the proposed waterproofing system. | ||||||||
Element: Provide quality assurance inspection protocols for the waterproofing installation, including substrate assessment for suitability, compliance of membrane installation with project specifications, completion inspection processes and repair and maintenance plan. | ||||||||
Element: Produce and submit design to stakeholders. |