Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCCWP5004 Mapping and Delivery Guide
Determine origin of water and moisture ingress into buildings
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCCWP5004 - Determine origin of water and moisture ingress into buildings |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Gather information. |
| |||||||
Element: Carry out analysis. |
| |||||||
Element: Gather relevant drawings, historical reports, design or structural specifications and certification where available. | ||||||||
Element: Identify signs and symptoms of the water or moisture ingress. | ||||||||
Element: Confirm scope of project based on information and evidence. | ||||||||
Element: Carry out investigation. |
| |||||||
Element: Determine if non-destructive or destructive investigation is required in consultation with stakeholders. | ||||||||
Element: Select tools and technologies to carry out inspections and testing procedures in accordance with site conditions. | ||||||||
Element: Carry out inspection and testing using valid testing methods in accordance with testing protocols and against controls and references. | ||||||||
Element: Record findings of investigation and testing protocols. | ||||||||
Element: Compare findings to information and evidence of water and moisture ingress areas and carry out further investigations where required. |
| |||||||
Element: Analyse causes of water and moisture ingress as determined by investigations and collected evidence. | ||||||||
Element: Determine if external factors have influenced the findings. | ||||||||
Element: Carry out re-testing to confirm influence of external factors where required. | ||||||||
Element: Record results of analysis for stakeholders in accordance with evidence to inform report. | ||||||||
Element: Report findings and conclusions. |
| |||||||
Element: Support diagnostic report findings with relevant references to regulatory requirements, Australian Standards, design and manufacturers’ requirements in accordance with stakeholder brief. | ||||||||
Element: Determine requirements for further support testing, follow-up investigations and monitoring of area in accordance with inspection and testing protocols. | ||||||||
Element: Communicate relevant and supported conclusions according to stakeholder expectations, context and requirements in accordance with report brief. | ||||||||
Element: Document the report in accordance with report brief. |