Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCPDR4012A Mapping and Delivery Guide
Design and size stormwater drainage systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCPDR4012A - Design and size stormwater drainage systems |
---|---|---|---|
Description | This unit of competency specifies the outcomes required to design, size and document the layout of surface and sub-soil stormwater drainage systems up to legal points of discharge.It covers the preparation for the planning, identification and confirmation of system specifications and requirements, the planning of the system layout and work finalisation processes, including records and documentation. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | Site location for application of the plan will be residential and commercial, and may be a new work site or an existing structure being renovated, extended, restored or maintained. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Nil Nil | ||
Competency Field | Drainage |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for planning. |
| |||||||
Element: Identify system requirements. |
| |||||||
Element: Design system layout. |
| |||||||
Element: Restore work area. |
|