Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCPRE2002 Mapping and Delivery Guide
Remove temporary supports from prefabricated concrete elements
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCPRE2002 - Remove temporary supports from prefabricated concrete elements |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Access the requirements to remove temporary supports from prefabricated concrete elements. |
| |||||||
Element: Prepare to remove temporary supports from prefabricated concrete elements. |
| |||||||
Element: Conduct the removal of temporary supports from prefabricated concrete elements. |
| |||||||
Element: Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. | ||||||||
Element: Conduct working at heights risk assessment and follow appropriate WHS processes. | ||||||||
Element: Identify safety signage and barricade requirements. | ||||||||
Element: Review environmental requirements for the task in accordance with environmental plans and legislative requirements. | ||||||||
Element: Access plant, tools and equipment required to carry out task. |
| |||||||
Element: Obtain plant, tools, equipment, check for serviceability and rectify or report any faults. | ||||||||
Element: Ensure the structural work is complete and that written approval from the in-service design engineer has been obtained so that removal of temporary supports can commence. |
| |||||||
Element: Assemble and erect lifting/handling devices for movement of loads. | ||||||||
Element: Follow load slinging and shifting requirements and conduct removal activity in accordance with erection design documentation, job safety and environmental analysis (JSEA) and safe work method statement (SWMS). | ||||||||
Element: Maintain stability of the braces and props during lifting and transportation. |
| |||||||
Element: Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements. |