Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCPRE2003 Mapping and Delivery Guide
Grout prefabricated concrete elements
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCPRE2003 - Grout prefabricated concrete elements |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Access requirements to grout prefabricated concrete elements. |
| |||||||
Element: Prepare to grout prefabricated concrete elements. |
| |||||||
Element: Mix flowable grout. |
| |||||||
Element: Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice. | ||||||||
Element: Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. | ||||||||
Element: Identify safety signage and barricade requirements. | ||||||||
Element: Review environmental requirements for the task in accordance with environmental plans and legislative requirements. | ||||||||
Element: Access plant, tools, equipment and materials required to carry out task. | ||||||||
Element: Locate the joints and confirm safety requirements, including working aloft, fall protection |
| |||||||
Element: Obtain plant, tools, equipment, check for serviceability and rectify or report any faults. | ||||||||
Element: Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets. | ||||||||
Element: Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured. | ||||||||
Element: Review the erection design documentation and the material data sheets to verify which gaps are to be grouted. | ||||||||
Element: Mix dry pack or trowelable grout. |
| |||||||
Element: Establish the volume of dry pack grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency. |
| |||||||
Element: Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials. | ||||||||
Element: Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets. | ||||||||
Element: Prepare prefabricated concrete joint and apply grouting. |
| |||||||
Element: Ensure all surfaces are clean, sound and free from dust, oils or other contaminants. | ||||||||
Element: Prepare the grouting surface in accordance with the erection design documentation and the material data sheets. | ||||||||
Element: Seal perimeter of the area to be grouted in accordance with specifications. | ||||||||
Element: Apply grout in accordance with the project specifications. | ||||||||
Element: Ensure that dry pack or trowelable grout is placed in a manner that ensures consolidation by tamping/rodding to eliminate any air voids. | ||||||||
Element: Once complete, compare the actual volume of grout to the calculated volume of grout required to ensure no blockage and/or air voids have formed. |
| |||||||
Element: Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements. |