Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCPRE2004 Mapping and Delivery Guide
Caulk prefabricated concrete elements
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | CPCPRE2004 - Caulk prefabricated concrete elements |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Access requirements to caulk prefabricated concrete elements. |
| |||||||
Element: Prepare to caulk prefabricated concrete elements. |
| |||||||
Element: Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. | ||||||||
Element: Conduct working at heights risk assessment and follow appropriate WHS processes. | ||||||||
Element: Identify safety signage and barricade requirements. | ||||||||
Element: Review environmental requirements for the task in accordance with environmental plans and legislative requirements. | ||||||||
Element: Access tools, equipment and materials required to carry out task. | ||||||||
Element: Locate the joints and confirm safety requirements, including working aloft, fall protection, accessibility and drop zones. |
| |||||||
Element: Obtain plant, tools, equipment, check for serviceability and rectify or report any faults. | ||||||||
Element: Identify materials and associated quantities/measurements required for caulking according to specifications. | ||||||||
Element: Prepare concrete prefabricated joint and apply caulking and finishing technique. | ||||||||
Element: Check backing rod installation to ensure material is firmly secured within the joint, at the depth specified in the erection design documentation. | ||||||||
Element: Check backing rod installation is free of punctures and air pockets and complies with fire rating and acoustic requirements. | ||||||||
Element: Access approved sealant and apply in a constant motion using steady pressure, filling the required void, to achieve a uniform appearance in accordance with the manufacturer technical data sheet. | ||||||||
Element: Back tool the sealant immediately after caulking, using an appropriate caulking tool in accordance with the manufacturer technical data sheet to achieve a smooth and uniform finish, ensuring both sides of the joint are flush with sealant chamfer end. |
| |||||||
Element: Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements. |