Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

FBPSUG2005 Mapping and Delivery Guide
Construct turnouts

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency FBPSUG2005 - Construct turnouts
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the skills and knowledge required to construct turnouts in sugar cane haulage systems. It relates to construction of new turnouts and repair of existing turnouts.The unit applies to individuals who work under supervision in the sugar milling industry. All work must be carried out to comply with workplace procedures according to state/territory health and safety regulations, legislation and standards that apply to the workplace.No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare work
  • Identify the location and scope of work according to specifications
  • Confirm and prepare materials required to complete the work to specifications
  • Carry out pre-operational checks, confirm operational status of equipment, and report any faults
  • Select, fit and use personal protective equipment as required
  • Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress
  • Identify and remove potential hazards from construction area before commencing work
       
Element: Construct turnouts
  • Position sleepers for turnouts in required position for track junctions
  • Fix base plates for switching to sleepers in specified locations
  • Position and fit switch rails to specification
  • Install switching gear to specification
       
Element: Complete work
  • Clear the construction area of debris according to workplace procedures
  • Store unused materials according to workplace procedures
  • Clean and store tools, plant and equipment according to workplace requirements
  • Record workplace information according to workplace requirements
  • Identify the location and scope of work according to specifications
  • Confirm and prepare materials required to complete the work to specifications
  • Carry out pre-operational checks, confirm operational status of equipment, and report any faults
  • Select, fit and use personal protective equipment as required
  • Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress
  • Identify and remove potential hazards from construction area before commencing work
  • Position sleepers for turnouts in required position for track junctions
  • Fix base plates for switching to sleepers in specified locations
  • Position and fit switch rails to specification
  • Install switching gear to specification
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify the location and scope of work according to specifications 
Confirm and prepare materials required to complete the work to specifications 
Carry out pre-operational checks, confirm operational status of equipment, and report any faults 
Select, fit and use personal protective equipment as required 
Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress 
Identify and remove potential hazards from construction area before commencing work 
Position sleepers for turnouts in required position for track junctions 
Fix base plates for switching to sleepers in specified locations 
Position and fit switch rails to specification 
Install switching gear to specification 
Clear the construction area of debris according to workplace procedures 
Store unused materials according to workplace procedures 
Clean and store tools, plant and equipment according to workplace requirements 
Record workplace information according to workplace requirements 
Identify the location and scope of work according to specifications 
Confirm and prepare materials required to complete the work to specifications 
Carry out pre-operational checks, confirm operational status of equipment, and report any faults 
Select, fit and use personal protective equipment as required 
Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress 
Identify and remove potential hazards from construction area before commencing work 
Position sleepers for turnouts in required position for track junctions 
Fix base plates for switching to sleepers in specified locations 
Position and fit switch rails to specification 
Install switching gear to specification 

Forms

Assessment Cover Sheet

FBPSUG2005 - Construct turnouts
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

FBPSUG2005 - Construct turnouts

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: