Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICPPTD302 Mapping and Delivery Guide
Set up and produce 3D prints

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency ICPPTD302 - Set up and produce 3D prints
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to produce three-dimensional (3D) objects for internal and external clients using a 3D printer.It applies to individuals employed in a range of industry sectors who use 3D files and scanning data to produce 3D objects for a range of applications.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Identify the print requirements
  • Determine object requirements against client specifications and confirm with client
  • Evaluate available printer and materials to determine preferred options to meet client specifications
  • Calculate print construction time and cost and obtain client approval to proceed with preferred options
  • Upload data files into the printer software and check 3D model to ensure it meets specifications
  • Assess quality of data file and discuss possible adjustments with client
  • Adjust file as required and save in required printer format
       
Element: Prepare the 3D printer
  • Select personal protective equipment (PPE) and fit in accordance with work health and safety (WHS) procedures
  • Conduct pre start checks on the 3D printer to ensure correct operation according to manufacturer operating procedures
  • Adjust printer settings for specified tolerances and in accordance with client specifications
  • Load printer with specified construction material in accordance with client specifications
  • Install and prepare printer build platform according to manufacturer operating procedures
       
Element: Operate and monitor the 3D printer
  • Operate printer in accordance with manufacturer operating procedures and WHS procedures
  • Check sensor displays and readings to ensure that they remain within the correct operating parameters specified in the manufacturer operating procedures
  • Monitor printing process to check that object is forming as per client specifications, and adjust as necessary
  • Monitor consumables and recharge as required
  • Report errors and faults in operation to relevant personnel for maintenance or repair
       
Element: Remove and prepare model for client
  • Remove printed 3D object from the printer bed according to manufacturer operating procedures
  • Remove support framework using appropriate tools, chemicals and PPE, and according to manufacturer operating procedures
  • Clean and prepare 3D object in accordance with client specifications
       
Element: Reset printer ready for next job or shutdown
  • Clean printer and worksite in accordance with organisational policies and procedures and manufacturer operating procedures after each print
  • Determine reset or shutdown requirements based on print queue, and reset or shutdown printer according to organisational and manufacturer operating procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Determine object requirements against client specifications and confirm with client 
Evaluate available printer and materials to determine preferred options to meet client specifications 
Calculate print construction time and cost and obtain client approval to proceed with preferred options 
Upload data files into the printer software and check 3D model to ensure it meets specifications 
Assess quality of data file and discuss possible adjustments with client 
Adjust file as required and save in required printer format 
Select personal protective equipment (PPE) and fit in accordance with work health and safety (WHS) procedures 
Conduct pre start checks on the 3D printer to ensure correct operation according to manufacturer operating procedures 
Adjust printer settings for specified tolerances and in accordance with client specifications 
Load printer with specified construction material in accordance with client specifications 
Install and prepare printer build platform according to manufacturer operating procedures 
Operate printer in accordance with manufacturer operating procedures and WHS procedures 
Check sensor displays and readings to ensure that they remain within the correct operating parameters specified in the manufacturer operating procedures 
Monitor printing process to check that object is forming as per client specifications, and adjust as necessary 
Monitor consumables and recharge as required 
Report errors and faults in operation to relevant personnel for maintenance or repair 
Remove printed 3D object from the printer bed according to manufacturer operating procedures 
Remove support framework using appropriate tools, chemicals and PPE, and according to manufacturer operating procedures 
Clean and prepare 3D object in accordance with client specifications 
Clean printer and worksite in accordance with organisational policies and procedures and manufacturer operating procedures after each print 
Determine reset or shutdown requirements based on print queue, and reset or shutdown printer according to organisational and manufacturer operating procedures 

Forms

Assessment Cover Sheet

ICPPTD302 - Set up and produce 3D prints
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPPTD302 - Set up and produce 3D prints

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: