Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICTCBL253 Mapping and Delivery Guide
Construct underground telecommunications infrastructure

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency ICTCBL253 - Construct underground telecommunications infrastructure
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to construct underground telecommunications infrastructure, made up of conduits and enclosures, for cabling provisioning.It applies to individuals in technical roles in civil construction who install pits and pre-built enclosures with connecting pipes for underground telecommunications infrastructure, predominantly in greenfield sites.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to construct underground work
  • Obtain construction design plan from appropriate personnel to scope work and arrange for site access
  • Notify appropriate personnel of identified safety hazards and other services that will need to be considered
  • Obtain plant, tools and safety equipment to perform tasks safely and efficiently
  • Determine type of underground pit/manhole required for project as specified in construction design plan
       
Element: Install enclosure
  • Use tools according to enterprise guidelines and work health and safety (WHS) regulations
  • Determine excavation meets specification of design plan
  • Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation
  • Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities
  • Install earth mat facility under enclosure as required by enterprise
  • Install enclosure specified in construction design plan according to manufacturer specifications using specified materials
       
Element: Install connecting pipe works
  • Install conduit in trench to enterprise specifications
  • Connect conduit to enclosure according to manufacturer specifications and industry practice
       
Element: Complete project
  • Complete reports and record alterations to plans using appropriate symbols, according to enterprise policy
  • Complete all labelling requirements according to industry standard
  • Recover obsolete materials and equipment, and return to appropriate point for disposal
  • Restore site according to enterprise or approving authority requirements and to customer satisfaction
  • Notify appropriate personnel of job completion and obtain sign-off
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain construction design plan from appropriate personnel to scope work and arrange for site access 
Notify appropriate personnel of identified safety hazards and other services that will need to be considered 
Obtain plant, tools and safety equipment to perform tasks safely and efficiently 
Determine type of underground pit/manhole required for project as specified in construction design plan 
Use tools according to enterprise guidelines and work health and safety (WHS) regulations 
Determine excavation meets specification of design plan 
Place foundation of suitable material to provide safe and stable footing prior to installing underground enclosure in excavation 
Place recognised barrier over construction where enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities 
Install earth mat facility under enclosure as required by enterprise 
Install enclosure specified in construction design plan according to manufacturer specifications using specified materials 
Install conduit in trench to enterprise specifications 
Connect conduit to enclosure according to manufacturer specifications and industry practice 
Complete reports and record alterations to plans using appropriate symbols, according to enterprise policy 
Complete all labelling requirements according to industry standard 
Recover obsolete materials and equipment, and return to appropriate point for disposal 
Restore site according to enterprise or approving authority requirements and to customer satisfaction 
Notify appropriate personnel of job completion and obtain sign-off 

Forms

Assessment Cover Sheet

ICTCBL253 - Construct underground telecommunications infrastructure
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTCBL253 - Construct underground telecommunications infrastructure

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: