MEAENG0004 Mapping and Delivery Guide
Apply systems engineering procedures to airworthiness engineering design project management

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEAENG0004 - Apply systems engineering procedures to airworthiness engineering design project management
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Analyse and document system requirements
  • Identify and document customer or contractual system requirements including inputs and relevant regulatory requirements
  • Set up a system engineering team and allocate responsibilities
  • Analyse system requirements and define functional requirements and design constraints
       
Element: Perform functional analysis and allocation
  • Decompose system functions to lower-level functions applicable to system design
  • Allocate design constraints to all functional levels
  • Define and refine internal and external functional interfaces
  • Define, refine and integrate functional architecture
  • Review functional analysis outcomes against requirements and revise where necessary
  • Develop and document the functional baseline
       
Element: Manage preliminary design activities
  • Coordinate the development of performance specifications for the system and components
  • Select preferred product and process solutions
  • Define and refine internal and external physical interfaces
  • Define and refine system software requirements
  • Develop and document the allocated baseline
       
Element: Manage the detail design activities
  • Coordinate the development of item, process and material specifications
  • Coordinate the development of software specifications
  • Coordinate the development of engineering drawings and associated material/component/hardware lists
  • Coordinate the development of item performance specifications
  • Determine product review and design verification procedures
  • Develop and document the product baseline
       
Element: Provide oversight of production and delivery
  • Apply product review and verification procedures and initiate action to remedy design or production deficiencies
  • Ensure that all relevant regulatory requirements are being met
       
Element: Provide for life-cycle management of the system, components and software
  • Where there is a contractual requirement for application of CM, provide the technical data package and define the configuration items and baselines
  • Where there is a contractual requirement for ILS, provide the technical data package and data required for the development of the relevant ILS plans
  • Where there are no contractual requirements regarding life-cycle management, deliver the technical data package and develop procedures for the management of the configuration of the system, system components and software that meet relevant regulatory requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and document customer or contractual system requirements including inputs and relevant regulatory requirements 
Set up a system engineering team and allocate responsibilities 
Analyse system requirements and define functional requirements and design constraints 
Decompose system functions to lower-level functions applicable to system design 
Allocate design constraints to all functional levels 
Define and refine internal and external functional interfaces 
Define, refine and integrate functional architecture 
Review functional analysis outcomes against requirements and revise where necessary 
Develop and document the functional baseline 
Coordinate the development of performance specifications for the system and components 
Select preferred product and process solutions 
Define and refine internal and external physical interfaces 
Define and refine system software requirements 
Develop and document the allocated baseline 
Coordinate the development of item, process and material specifications 
Coordinate the development of software specifications 
Coordinate the development of engineering drawings and associated material/component/hardware lists 
Coordinate the development of item performance specifications 
Determine product review and design verification procedures 
Develop and document the product baseline 
Apply product review and verification procedures and initiate action to remedy design or production deficiencies 
Ensure that all relevant regulatory requirements are being met 
Where there is a contractual requirement for application of CM, provide the technical data package and define the configuration items and baselines 
Where there is a contractual requirement for ILS, provide the technical data package and data required for the development of the relevant ILS plans 
Where there are no contractual requirements regarding life-cycle management, deliver the technical data package and develop procedures for the management of the configuration of the system, system components and software that meet relevant regulatory requirements 

Forms

Assessment Cover Sheet

MEAENG0004 - Apply systems engineering procedures to airworthiness engineering design project management
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEAENG0004 - Apply systems engineering procedures to airworthiness engineering design project management

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: