Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEAMEC0054 Mapping and Delivery Guide
Modify and repair aircraft composite structure using cold bonding

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEAMEC0054 - Modify and repair aircraft composite structure using cold bonding
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan repair or modification
  • Assess the extent of damage, including using visual and tap test methods, to assist in determining modification or repair procedure
  • Support and prepare structure in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage, while observing all relevant work health and safety (WHS) requirements, including the use of material safety data sheets (MSDSs) and items of personal protective equipment (PPE)
  • Identify appropriate modification or repair scheme in accordance with structural repair manual or approved data
  • Obtain specialist advice in establishing an approved modification or repair scheme where a standard modification or repair scheme cannot be identified, or damage criteria are out of limits
  • Organise required materials and equipment in accordance with maintenance manual
       
Element: Repair or modify components using cold cure
  • Check lay-up of materials to confirm that components meet required specifications and bagging equipment is correctly installed and operated
  • Regularly monitor curing cycle to ensure required specifications are met
  • Check components for blemishes or delamination in accordance with quality procedures
  • Make ready component assemblies requiring further or special treatment for the appropriate processes
  • Complete required maintenance documentation and process in accordance with standard enterprise procedures
  • Tag, seal and pack completed assemblies as required
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Assess the extent of damage, including using visual and tap test methods, to assist in determining modification or repair procedure 
Support and prepare structure in accordance with the applicable maintenance manual to ensure personnel safety and freedom from damage, while observing all relevant work health and safety (WHS) requirements, including the use of material safety data sheets (MSDSs) and items of personal protective equipment (PPE) 
Identify appropriate modification or repair scheme in accordance with structural repair manual or approved data 
Obtain specialist advice in establishing an approved modification or repair scheme where a standard modification or repair scheme cannot be identified, or damage criteria are out of limits 
Organise required materials and equipment in accordance with maintenance manual 
Check lay-up of materials to confirm that components meet required specifications and bagging equipment is correctly installed and operated 
Regularly monitor curing cycle to ensure required specifications are met 
Check components for blemishes or delamination in accordance with quality procedures 
Make ready component assemblies requiring further or special treatment for the appropriate processes 
Complete required maintenance documentation and process in accordance with standard enterprise procedures 
Tag, seal and pack completed assemblies as required 

Forms

Assessment Cover Sheet

MEAMEC0054 - Modify and repair aircraft composite structure using cold bonding
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEAMEC0054 - Modify and repair aircraft composite structure using cold bonding

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: