Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEAMEC0055 Mapping and Delivery Guide
Shot-peen aircraft components

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEAMEC0055 - Shot-peen aircraft components
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for shot-peening task
  • Obtain and interpret process documentation requirements
  • Prepare shot-peening equipment in accordance with the applicable process
       
Element: Apply shot-peening process to Almen strip
  • Select and fit the correct Almen strip and set up equipment with the correct stand-off distance and regulated air pressure or spindle speed in accordance with the process documentation
  • Implement applicable work health and safety (WHS) provisions, including the use of material safety data sheets (MSDSs) and personal protective equipment (PPE)
  • Apply the process to the Almen strip
  • Measure the Almen strip distortion to ensure that it is within the specified tolerance
  • Adjust equipment settings and repeat the Almen strip test when required
  • Record settings that produce specified Almen strip distortion and present the test strip for inspection
       
Element: Apply shot-peening process to component
  • Clean and mask the component in accordance with process documentation
  • Apply shot-peening in accordance with the process documentation using equipment settings derived from Almen test strip and while observing all WHS requirements, including use of MSDSs and PPE
  • Check the shot peened surface for required density and coverage and re-peen, when required
  • Check the shot-peened component for cleanliness to ensure that all contaminants have been removed in accordance with the process documentation
       
Element: Complete shot-peening task
  • Record task completion in accordance with standard enterprise procedures
  • Present shot-peened component for inspection, along with Almen test strip and completed documentation
  • Tag, seal and pack the component, where applicable and in accordance with specified procedures
  • Dispose of waste shot peening media in accordance with procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain and interpret process documentation requirements 
Prepare shot-peening equipment in accordance with the applicable process 
Select and fit the correct Almen strip and set up equipment with the correct stand-off distance and regulated air pressure or spindle speed in accordance with the process documentation 
Implement applicable work health and safety (WHS) provisions, including the use of material safety data sheets (MSDSs) and personal protective equipment (PPE) 
Apply the process to the Almen strip 
Measure the Almen strip distortion to ensure that it is within the specified tolerance 
Adjust equipment settings and repeat the Almen strip test when required 
Record settings that produce specified Almen strip distortion and present the test strip for inspection 
Clean and mask the component in accordance with process documentation 
Apply shot-peening in accordance with the process documentation using equipment settings derived from Almen test strip and while observing all WHS requirements, including use of MSDSs and PPE 
Check the shot peened surface for required density and coverage and re-peen, when required 
Check the shot-peened component for cleanliness to ensure that all contaminants have been removed in accordance with the process documentation 
Record task completion in accordance with standard enterprise procedures 
Present shot-peened component for inspection, along with Almen test strip and completed documentation 
Tag, seal and pack the component, where applicable and in accordance with specified procedures 
Dispose of waste shot peening media in accordance with procedures 

Forms

Assessment Cover Sheet

MEAMEC0055 - Shot-peen aircraft components
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEAMEC0055 - Shot-peen aircraft components

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: