Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM09217 Mapping and Delivery Guide
Prepare plans for pipe and duct fabrication

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM09217 - Prepare plans for pipe and duct fabrication
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Access and interpret specifications
  • Follow standard operating procedures (SOPs) and comply with work health and safety (WHS) requirements at all times
  • Interpret project specifications and requirements for pipework, including layout, sizing and type of pipe and duct required
  • Determine implications and requirements for pipe fabrication and support
  • Access and interpret organisational and industry standards, information and catalogues to obtain required product specifications
       
Element: Document pipe fabrication
  • Determine appropriate methods of joining and cutting pipe materials being used
  • Determine appropriate methods for supporting pipework materials being used
  • Document pipe fabrication requirements on plans
  • Document pipe support requirements on plans
  • Include instructions for electrolysis of dissimilar materials on plans
       
Element: Document duct fabrication
  • Determine appropriate methods of joining and cutting duct materials being used
  • Determine appropriate methods for supporting duct work materials being used
  • Document duct fabrication requirements on plans
  • Document duct support requirements on plans
  • Include instructions for electrolysis of dissimilar materials on plans
       
Element: Complete and store drawings
  • Complete drawings and associated technical information in accordance with project requirements and SOPs
  • Process drawings and associated documentation for approval in accordance with organisational requirements
  • Store drawings and associated documentation in accordance with SOPs
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) and comply with work health and safety (WHS) requirements at all times 
Interpret project specifications and requirements for pipework, including layout, sizing and type of pipe and duct required 
Determine implications and requirements for pipe fabrication and support 
Access and interpret organisational and industry standards, information and catalogues to obtain required product specifications 
Determine appropriate methods of joining and cutting pipe materials being used 
Determine appropriate methods for supporting pipework materials being used 
Document pipe fabrication requirements on plans 
Document pipe support requirements on plans 
Include instructions for electrolysis of dissimilar materials on plans 
Determine appropriate methods of joining and cutting duct materials being used 
Determine appropriate methods for supporting duct work materials being used 
Document duct fabrication requirements on plans 
Document duct support requirements on plans 
Include instructions for electrolysis of dissimilar materials on plans 
Complete drawings and associated technical information in accordance with project requirements and SOPs 
Process drawings and associated documentation for approval in accordance with organisational requirements 
Store drawings and associated documentation in accordance with SOPs 

Forms

Assessment Cover Sheet

MEM09217 - Prepare plans for pipe and duct fabrication
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM09217 - Prepare plans for pipe and duct fabrication

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: