Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM09227 Mapping and Delivery Guide
Establish structural steel detailing project arrangements

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM09227 - Establish structural steel detailing project arrangements
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
  • Comply with work health and safety (WHS) requirements at all times
  • Identify job requirements from specifications and other available information
       
Element: Determine requirements for structural steel detailing
  • Obtain contact information
  • Obtain project timeline and schedules and determine delivery dates for detail drawings
  • Agree on procedures for making requests for further information (RFIs)
  • Determine requirements for attendance at team meetings and site visits
  • Determine detailing information requirements
  • Obtain design information from architect and consulting engineer
  • Use design information and project schedules to assess the scope and complexity of detailing tasks
       
Element: Establish structural steel detailing arrangements for project
  • Communicate details of structural steel detailing team to client
  • Establish document control procedures
  • Establish steel detailing tasks and deadlines and check against construction project schedules
  • Assess capabilities of proprietary computer-aided design (CAD) and steel detailing software for project and make a decision to use computer based or manual structural detailing methods
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
Comply with work health and safety (WHS) requirements at all times 
Identify job requirements from specifications and other available information 
Obtain contact information 
Obtain project timeline and schedules and determine delivery dates for detail drawings 
Agree on procedures for making requests for further information (RFIs) 
Determine requirements for attendance at team meetings and site visits 
Determine detailing information requirements 
Obtain design information from architect and consulting engineer 
Use design information and project schedules to assess the scope and complexity of detailing tasks 
Communicate details of structural steel detailing team to client 
Establish document control procedures 
Establish steel detailing tasks and deadlines and check against construction project schedules 
Assess capabilities of proprietary computer-aided design (CAD) and steel detailing software for project and make a decision to use computer based or manual structural detailing methods 

Forms

Assessment Cover Sheet

MEM09227 - Establish structural steel detailing project arrangements
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM09227 - Establish structural steel detailing project arrangements

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: