Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM10002 Mapping and Delivery Guide
Terminate and connect electrical wiring

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM10002 - Terminate and connect electrical wiring
Description
Employability Skills
Learning Outcomes and Application This unit of competency defines the skills and knowledge required to terminate, disconnect or reconnect electrical wiring, including all types of cords and cables and circuits, excluding specialist cables.All testing is undertaken on completed circuits where these are not connected to main supply, using appropriate methods including continuity and resistance checks.Where soldering/desoldering of electrical/electronic components is required see unit MEM05001 Perform manual soldering/desoldering - electrical/electronic components and unit MEM05002 Perform high reliability soldering and desoldering, as appropriate.Where termination and connection of specialist cables such as mineral insulated, steel wire and armoured cables is required see unit MEM10011 Terminate and connect specialist cables.This unit does not cover the competencies required for energising and testing of the circuit. Some jurisdictions may require the holder of this unit to be licensed or certified and users should check with the relevant authorities.Band: AUnit Weight: 3
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Installation and commissioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
       
Element: Comply with work health and safety (WHS) requirements at all times
       
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs
       
Element: Identify job requirements from specifications, drawings, job sheets or work instructions
       
Element: Prepare for electrical wiring termination and connection
  • Undertake all work safely and to workplace procedures and state/territory regulations and legislative requirements
       
Element: Check materials for correct specifications
       
Element: Undertake preparation of work or check/inspect for correct location and specifications of cable trays, brackets and trenches
       
Element: Connect electrical wiring
  • Ensure terminations/connections are made to specifications, manufacturers' requirements and to safety and state/territory regulations and legislative requirements
       
Element: Adjust and fix all brackets, clamps and holders to specifications
       
Element: Ensure all cables, wires, conductors and connections are marked/tagged and labelled to specification
       
Element: Test terminated cables to ensure continuity and insulation resistance readings comply with requirements
       
Element: Complete all reports and documentation correctly to required specifications
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Electrical wiring includes one (1) or more of the following:

wiring associated with:

control wiring

machinery

other electrical apparatus

Terminations/connections include one (1) or more of the following:

clamping

crimping

pin connection

soldered joints

plugs

sockets

clamping of cables and wires and sealing entry points where required

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
 
 
 
Undertake all work safely and to workplace procedures and state/territory regulations and legislative requirements 
 
 
Ensure terminations/connections are made to specifications, manufacturers' requirements and to safety and state/territory regulations and legislative requirements 
 
 
 
 

Forms

Assessment Cover Sheet

MEM10002 - Terminate and connect electrical wiring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM10002 - Terminate and connect electrical wiring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: