Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM10009 Mapping and Delivery Guide
Install refrigeration and air conditioning plant and equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM10009 - Install refrigeration and air conditioning plant and equipment
Description
Employability Skills
Learning Outcomes and Application This unit of competency defines the skills and knowledge required to install refrigeration/air conditioning systems in commercial, industrial, marine and transport applications in accordance with all relevant Commonwealth, state or territory legislation and regulatory requirements. Work is undertaken using new or existing internal or external locations and sites and footings, foundations, beds and frameworks are completed prior to installation. This unit should not be selected with unit MEM10006 Install machine/plant.Where extensive fitting and alignment are required then see the following units:MEM18006 Perform precision fitting of engineering componentsMEM18009 Perform precision levelling and alignment of machines and engineering components Where modifications involve electrical disconnection and reconnection see unit MEM18049 Disconnect/reconnect fixed wired equipment up to 1000 volts a.c./1500 volts d.c. A Refrigerant Handling Licence must be held by any person who carries out work in relation to refrigeration and air conditioning equipment.Band: AUnit Weight: 4
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Installation and commissioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
  • Follow standard operating procedures (SOPs)
       
Element: Comply with work health and safety (WHS) requirements at all times
       
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs
       
Element: Identify job requirements from specifications, drawings, job sheets or work instructions
       
Element: Inspect and prepare installation site
  • Check site for correct location, dimension and levels using appropriate measuring equipment and standard refrigeration/air conditioning practices
       
Element: Report non-compliance with specification to appropriate authority
       
Element: Undertake alteration/correction with approval of appropriate authority
       
Element: Prepare all surfaces, materials and components for use
       
Element: Install refrigeration/air conditioning plant and equipment
  • Carry out all work safely and in accordance with site procedures and to relevant standards
       
Element: Organise refrigeration/air conditioning plant and equipment/components for correct sequential installation
       
Element: Install refrigeration/air conditioning plant and equipment/components in conformance with manufacturers' and site specifications
       
Element: Undertake routine modifications/alterations of the refrigeration/air conditioning plant and equipment according to procedures, as required
       
Element: Ensure refrigeration/air conditioning plant and equipment are levelled, aligned, coupled and connected in accordance with specifications
       
Element: Ensure the refrigeration system is charged with refrigerant and lubricant in accordance with procedures
       
Element: Clean the site and clear all debris and leave in a safe state
       
Element: Start up refrigeration/ air conditioning plant and equipment and check operation
  • Develop start-up procedure for the refrigeration/air conditioning plant and equipment
       
Element: Ensure the refrigeration/air conditioning plant and equipment are operated and assessed for conformance to specification
       
Element: Identify non-conformances and system faults and take appropriate action/adjustments to specification
       
Element: Complete all reports and documentation to required specifications
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Measuring equipment includes one (1) or more of the following:

lasers

dumpy levels

Relevant standards include one (1) or more of the following:

Australian Standards

building codes

air conditioning/refrigeration standards

local authority standards

environmental standards

greenhouse emission regulations

Refrigeration/air conditioning plant and equipment/components include one or more of the following:

compressors

evaporators

condensers

valves

controllers

fans

solenoids

sensors

thermostats

switches

recorders

Routine modifications/alterations include one (1) or more of the following:

fitting of spacers

relocation of brackets

alignment of holes

Appropriate action includes the following:

in accordance with urgency requirements to address equipment failure and/or personnel danger

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
 
 
 
Check site for correct location, dimension and levels using appropriate measuring equipment and standard refrigeration/air conditioning practices 
 
 
 
Carry out all work safely and in accordance with site procedures and to relevant standards 
 
 
 
 
 
 
Develop start-up procedure for the refrigeration/air conditioning plant and equipment 
 
 
 

Forms

Assessment Cover Sheet

MEM10009 - Install refrigeration and air conditioning plant and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM10009 - Install refrigeration and air conditioning plant and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: