Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MEM10013A Mapping and Delivery Guide
Install split air conditioning systems and associated pipework
Version 1.0
Issue Date: June 2024
Qualification | - |
Unit of Competency | MEM10013A - Install split air conditioning systems and associated pipework |
---|---|---|---|
Description | This unit covers installing split air conditioning systems to relevant standards, codes and local regulations. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | This competency unit is limited to split air conditioning applications only. The unit includes safe working practice and following standard procedures and manufacturer instructions to install split air conditioning equipment.For commissioning and decommisioning of split air conditioning systems unit MEM18084A should also be selected.This unit refers to plug in applications only. Where the installation and connection to mains supply of fixed wiring is necessary then this work must be undertaken by a suitably licensed person Persons competent in and undertaking work covered by this unit are required to hold the national restricted split system installation and decommissioning license.Band: AUnit Weight: 6 | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Path 1MEM05006C Perform brazing and/or silver solderingMEM09002B Interpret technical drawingMEM12023A Perform engineering measurementsMEM18001C Use hand toolsMEM18002B Use power tools/hand held operationsMEM18055B Dismantle, replace and assemble engineering components | ||
Competency Field | Installation and commissioning |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Locate split air conditioning components |
| |||||||
Element: Inspect and prepare installation sites |
| |||||||
Element: Prepare split system equipment and materials for installation |
| |||||||
Element: Prepare and install refrigerant pipework |
|