• MEM15007B - Conduct product and/or process capability studies

Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM15007B Mapping and Delivery Guide
Conduct product and/or process capability studies

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM15007B - Conduct product and/or process capability studies
Description This unit covers conducting process capability studies, setting control limits and selecting sampling plans.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to the analysis of data from a production section or processes using appropriate statistical techniques. Consultation may be required with production or process personnel and is undertaken within the enterprise's total quality plan.Band: BUnit Weight: 6
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Path 1MEM12024A Perform computations MEM12025A Use graphical techniques and perform simple statistical computations MEM15001B Perform basic statistical quality control MEM15008B Perform advanced statistical quality control
Competency Field Quality
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Conduct process capability studies
  • Procedure for conducting capability study is determined.
  • Instructions for personnel conducting trial run are prepared.
  • Data from trial run is analysed and the process capability is calculated.
  • Possible number of product defects from a particular process is estimated.
  • Optimum target mean to suit process capability data is determined.
  • Reports listing various options from process capability studies are prepared.
  • Design specifications based on an analysis of data are recommended.
       
Element: Set control limits
  • Control limits for sample/subgroup average, range and standard deviation are calculated.
  • Warning limits for subgroup average, range and standard deviation are calculated.
  • Course of action resulting from out of control situation is determined and documented to standard operating procedures.
       
Element: Select sampling plans
  • Appropriate sampling plan to suit production schedule is selected and acceptable quality limits are determined, taking into account specified producer and consumer risks.
  • Sampling plan is documented including implementation strategy.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to conduct product and/or process capability studies. Competency in this unit cannot be claimed until all prerequisites have been satisfied.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with conducting product and/or process capability studies or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Look for evidence that confirms skills in:

collecting and collating data

analysing data, identifying solutions and developing recommendations

preparing reports listing the various options identified from the process capability study

determining process design specifications from process capability data

documenting sampling plan and implementation strategy

Required knowledge

Look for evidence that confirms knowledge of:

the process to be studied

the procedures for conducting process capability studies

the data used to calculate the process capability

the procedures for estimating the possible number of product defects

options for improving the process and benefits of each

the procedures for determining the optimum target mean

the procedures for setting control limits

numerical operations and calculations/formulae for process capability, control limits and other outcomes within the scope of this unit

the procedures for setting warning limits

the concept of 'out of control' situations

the action to be taken when an 'out of control' situation is detected

the procedures for documenting 'out of control' situations

the acceptable level of quality

a variety of sampling plans and their application

the sampling plan to be applied to a given situation

the reasons for selecting the chosen plan

the acceptable quality limits

the risks associated with identifying acceptable quality limits for the producer and customer

the procedures for documenting and implementing sampling plans

hazards and control measures

use and application of personal protective equipment

safe work practices and procedures

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedure

Frequency of sample, sample size

Data

From periodic samples drawn from a trial run of the process

Process capability

The natural tolerance of the process which may be calculated at 3 sigma/standard deviations

Product defects

From a consideration of 3 or 6 sigma standard deviations compared to specification requirements etc.

Various options

Adjustment of process to move average; improvements to reduce process capability; changes to reduce assignable causes

Appropriate sampling plan

Plans within the adopted quality system, sample size, frequency of sample etc.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Procedure for conducting capability study is determined. 
Instructions for personnel conducting trial run are prepared. 
Data from trial run is analysed and the process capability is calculated. 
Possible number of product defects from a particular process is estimated. 
Optimum target mean to suit process capability data is determined. 
Reports listing various options from process capability studies are prepared. 
Design specifications based on an analysis of data are recommended. 
Control limits for sample/subgroup average, range and standard deviation are calculated. 
Warning limits for subgroup average, range and standard deviation are calculated. 
Course of action resulting from out of control situation is determined and documented to standard operating procedures. 
Appropriate sampling plan to suit production schedule is selected and acceptable quality limits are determined, taking into account specified producer and consumer risks. 
Sampling plan is documented including implementation strategy. 

Forms

Assessment Cover Sheet

MEM15007B - Conduct product and/or process capability studies
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM15007B - Conduct product and/or process capability studies

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: