Employability Skills | |||
Learning Outcomes and Application | This unit of competency defines the skills and knowledge required to analyse condition monitoring results and develop recommendations based on the analysis. The data analysed is generated by a continuous plant and equipment condition monitoring program.Where production of formal reports is required unit MEM16010 Write reports should also be selected.Where production of reports of a technical nature is required unit MEM16014 Report technical information should also be selected.Where equipment condition monitoring and recording only is required to be performed then unit MEM18010 Perform equipment condition monitoring and recording should be selected.No licensing, legislative or certification requirements apply to this unit at the time of publication.Band: BUnit Weight: 4 | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance and diagnostics |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Determine job requirements |
| |||||||
Element: Comply with work health and safety (WHS) requirements at all times | ||||||||
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs | ||||||||
Element: Identify job requirements from specifications, drawings, job sheets or work instructions | ||||||||
Element: Analyse condition monitoring results |
| |||||||
Element: Undertake necessary calculations/computations to determine indications of malfunction or impending failure | ||||||||
Element: Undertake appropriate reports/determinations of analyses to prescribed site SOPs | ||||||||
Element: Develop recommendations |
| |||||||
Element: Report recommendations to appropriate authority |