Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MEM18049 Mapping and Delivery Guide
Disconnect/reconnect fixed wired equipment up to 1000 volts a.c./1500 volts d.c.
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | MEM18049 - Disconnect/reconnect fixed wired equipment up to 1000 volts a.c./1500 volts d.c. |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit of competency defines the skills and knowledge required to disconnect and reconnect equipment to all voltage levels up to1000 volts a.c./1500 volts d.c. Where the selection and use of power tools/hand held operations is required unit MEM18002 Use power tools/hand held operations should also be selected.Some jurisdictions may require the holder of this unit to be licensed or certified and users should check with the relevant authorities.Band:This unit has dual status and is to be regarded as both a specialisation Band A unit and Specialisation Band B unit for progression to C7 (AQF level IV).Unit Weight: 3 | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field | Maintenance and diagnostics |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Disconnect equipment |
| |||||||
Element: Connect equipment |
| |||||||
Element: Determine job requirements |
| |||||||
Element: Comply with work health and safety (WHS) requirements at all times | ||||||||
Element: Use appropriate personal protective equipment (PPE) in accordance with SOPs | ||||||||
Element: Identify job requirements from specifications, drawings, job sheets or work instructions |
| |||||||
Element: Determine and record equipment characteristics, including direction of rotation, where appropriate | ||||||||
Element: Identify point/s of electrical isolation and isolate equipment in accordance with procedures | ||||||||
Element: Use all lock-off equipment and signage requirements appropriately | ||||||||
Element: Prove electrical isolation using appropriate techniques, procedures and test equipment | ||||||||
Element: Note, record and label conductor layout | ||||||||
Element: Disconnect conductors and terminate and make safe disconnected cables/connections |
| |||||||
Element: Check circuit for safe isolation using appropriate test equipment, procedures and techniques | ||||||||
Element: Check connections and prepare conductors for termination | ||||||||
Element: Connect conductors to equipment in accordance with specifications and regulatory requirements | ||||||||
Element: Fasten/seal all cables/wires/conduit to specifications | ||||||||
Element: Remove all lock-off equipment and signage | ||||||||
Element: Check and test equipment and circuit for compliance with specifications and regulatory and legislative requirements | ||||||||
Element: Perform emergency first aid |
| |||||||
Element: Undertake rescue/recovery of injured person or provide assistance to injured person in accordance with recognised standards/procedures | ||||||||
Element: Make contact with the appropriate medical and rescue authorities | ||||||||
Element: Record details of first aid given |