Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
MEM18084A Mapping and Delivery Guide
Commission and decommission split air conditioning systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | MEM18084A - Commission and decommission split air conditioning systems |
---|---|---|---|
Description | This unit covers commissioning and decommissioning of split air conditioning systems to relevant standards, codes and local regulations. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | It includes the application of safe working practices, following standard procedures to pressure test, evacuate, recover, charge and perform functional checks to test system performance. This unit refers to plug in appliances only. For hard wired installations a licensed electrical tradesperson must undertake connection and disconnection.Band: AUnit Weight: 4 | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Path 1MEM09002B Interpret technical drawing MEM12023A Perform engineering measurements MEM18001C Use hand tools MEM18002B Use power tools/hand held operations MEM18055B Dismantle, replace and assemble engineering components | ||
Competency Field | Installation and commissioning |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Determine the operating conditions of vapour compression systems |
| |||||||
Element: Recover refrigerants from split air conditioning systems |
| |||||||
Element: Pressure and leak test split air conditioning systems |
| |||||||
Element: Evacuate split air conditioning systems |
| |||||||
Element: Charge split air conditioning systems |
| |||||||
Element: Test the operation of split air conditioning systems |
| |||||||
Element: Complete the commissioning/recommissioning of split air conditioning systems |
| |||||||
Element: Decommission split air conditioning systems |
|